2023-03-29 17:37:56+02:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-28 22:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-29 15:10:00+00:00
|
|
Érintett létesítmény / egység:
Lőrinci GT Erőmű
|
Kieső kapacitás:
170 MW
|
Időpont változás
|
|
MVM Balance Zártkörűen Működő Részvénytársaság
A0000141O.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-28 22:00:00+00:00
|
Event stop (UTC):
|
2023-03-29 15:10:00+00:00
|
|
Affected Asset or Unit:
Lőrinci Gas Turbine Power Plant
|
Unavailable Capacity:
170 MW
|
|
|
2023-03-29 14:52:05+02:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-04-03 07:00:00+00:00
|
Esemény vége (UTC):
|
2023-04-03 12:00:00+00:00
|
|
Érintett létesítmény / egység:
BEPCO
|
Kieső kapacitás:
12 MW
|
|
|
SC BEPCO SRL
A00047453.RO
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-04-03 07:00:00+00:00
|
Event stop (UTC):
|
2023-04-03 12:00:00+00:00
|
|
Affected Asset or Unit:
BEPCO
|
Unavailable Capacity:
12 MW
|
|
|
2023-03-28 02:42:21+02:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-28 00:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-28 08:00:00+00:00
|
|
Érintett létesítmény / egység:
IV. blokk
|
Kieső kapacitás:
14 MW
|
Kazánüzemi üzemzavar.
|
|
MVM Mátra Energia Zártkörűen Működő Részvénytársaság
A0000091L.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-28 00:00:00+00:00
|
Event stop (UTC):
|
2023-03-28 08:00:00+00:00
|
|
Affected Asset or Unit:
Unit 4
|
Unavailable Capacity:
14 MW
|
Breakdown in boiler operation.
|
|
2023-03-27 11:13:25+02:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-27 08:23:00+00:00
|
Esemény vége (UTC):
|
2023-03-27 08:47:00+00:00
|
|
Érintett létesítmény / egység:
Csepeli Erőmű Gőzturbina
|
Kieső kapacitás:
112 MW
|
N/A
|
|
Alpiq Csepel Korlátolt Felelősségű Társaság
A0000157B.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-27 08:23:00+00:00
|
Event stop (UTC):
|
2023-03-27 08:47:00+00:00
|
|
Affected Asset or Unit:
Csepel Power Plant Steam turbine
|
Unavailable Capacity:
112 MW
|
N/A
|
|
2023-03-27 06:29:50+02:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-27 03:30:00+00:00
|
Esemény vége (UTC):
|
2023-03-27 04:30:00+00:00
|
|
Érintett létesítmény / egység:
Csepeli Erőmű Gőzturbina
|
Kieső kapacitás:
71 MW
|
N/A
|
|
Alpiq Csepel Korlátolt Felelősségű Társaság
A0000157B.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-27 03:30:00+00:00
|
Event stop (UTC):
|
2023-03-27 04:30:00+00:00
|
|
Affected Asset or Unit:
Csepel Power Plant Steam turbine
|
Unavailable Capacity:
71 MW
|
N/A
|
|
2023-03-25 10:17:00+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-17 23:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-25 09:30:00+00:00
|
|
Érintett létesítmény / egység:
Csepeli Erőmű Gőzturibina
|
Kieső kapacitás:
105 MW
|
Záró időpont módosult.
|
|
Alpiq Csepel Korlátolt Felelősségű Társaság
A0000157B.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-17 23:00:00+00:00
|
Event stop (UTC):
|
2023-03-25 09:30:00+00:00
|
|
Affected Asset or Unit:
Csepel Power Plant Steam turbine
|
Unavailable Capacity:
105 MW
|
End time changed.
|
|
2023-03-25 10:15:44+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-17 23:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-25 09:30:00+00:00
|
|
Érintett létesítmény / egység:
Csepeli Erőmű GT2
|
Kieső kapacitás:
130 MW
|
Záró időpont módosult.
|
|
Alpiq Csepel Korlátolt Felelősségű Társaság
A0000157B.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-17 23:00:00+00:00
|
Event stop (UTC):
|
2023-03-25 09:30:00+00:00
|
|
Affected Asset or Unit:
Csepel Power Plant GT2
|
Unavailable Capacity:
130 MW
|
End time changed.
|
|
2023-03-25 10:14:22+02:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-17 23:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-25 09:30:00+00:00
|
|
Érintett létesítmény / egység:
Csepeli Erőmű GT1
|
Kieső kapacitás:
130 MW
|
Záró időpont módosult
|
|
Alpiq Csepel Korlátolt Felelősségű Társaság
A0000157B.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-17 23:00:00+00:00
|
Event stop (UTC):
|
2023-03-25 09:30:00+00:00
|
|
Affected Asset or Unit:
Csepel Power Plant GT1
|
Unavailable Capacity:
130 MW
|
End time canged.
|
|
2023-03-24 10:23:55+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-28 07:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-28 10:00:00+00:00
|
|
Érintett létesítmény / egység:
METROMNOUA
|
Kieső kapacitás:
2.5 MW
|
|
|
SC BEPCO SRL
A00047453.RO
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-28 07:00:00+00:00
|
Event stop (UTC):
|
2023-03-28 10:00:00+00:00
|
|
Affected Asset or Unit:
METROMNOUA
|
Unavailable Capacity:
2.5 MW
|
|
|
2023-03-24 10:18:17+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-22 19:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-31 21:00:00+00:00
|
|
Érintett létesítmény / egység:
BEPCO
|
Kieső kapacitás:
4 MW
|
|
|
SC BEPCO SRL
A00047453.RO
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-22 19:00:00+00:00
|
Event stop (UTC):
|
2023-03-31 21:00:00+00:00
|
|
Affected Asset or Unit:
BEPCO
|
Unavailable Capacity:
4 MW
|
|
|
2023-03-23 08:47:32+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-25 07:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-25 12:00:00+00:00
|
|
Érintett létesítmény / egység:
BEPCO
|
Kieső kapacitás:
13 MW
|
|
|
SC BEPCO SRL
A00047453.RO
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-25 07:00:00+00:00
|
Event stop (UTC):
|
2023-03-25 12:00:00+00:00
|
|
Affected Asset or Unit:
BEPCO
|
Unavailable Capacity:
13 MW
|
|
|
2023-03-23 08:43:42+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-25 07:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-25 16:00:00+00:00
|
|
Érintett létesítmény / egység:
BEPCO
|
Kieső kapacitás:
20 MW
|
|
|
SC BEPCO SRL
A00047453.RO
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-25 07:00:00+00:00
|
Event stop (UTC):
|
2023-03-25 16:00:00+00:00
|
|
Affected Asset or Unit:
BEPCO
|
Unavailable Capacity:
20 MW
|
|
|
2023-03-23 08:38:01+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-28 22:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-29 22:00:00+00:00
|
|
Érintett létesítmény / egység:
Lőrinci GT Erőmű
|
Kieső kapacitás:
170 MW
|
Időpont változás
|
|
MVM Balance Zártkörűen Működő Részvénytársaság
A0000141O.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-28 22:00:00+00:00
|
Event stop (UTC):
|
2023-03-29 22:00:00+00:00
|
|
Affected Asset or Unit:
Lőrinci Gas Turbine Power Plant
|
Unavailable Capacity:
170 MW
|
|
|
2023-03-23 07:05:17+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-24 08:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-24 09:00:00+00:00
|
|
Érintett létesítmény / egység:
BEPCO
|
Kieső kapacitás:
13 MW
|
|
|
SC BEPCO SRL
A00047453.RO
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-24 08:00:00+00:00
|
Event stop (UTC):
|
2023-03-24 09:00:00+00:00
|
|
Affected Asset or Unit:
BEPCO
|
Unavailable Capacity:
13 MW
|
|
|
2023-03-22 20:09:34+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-22 19:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-23 23:00:00+00:00
|
|
Érintett létesítmény / egység:
BEPCO
|
Kieső kapacitás:
4 MW
|
|
|
SC BEPCO SRL
A00047453.RO
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-22 19:00:00+00:00
|
Event stop (UTC):
|
2023-03-23 23:00:00+00:00
|
|
Affected Asset or Unit:
BEPCO
|
Unavailable Capacity:
4 MW
|
|
|
2023-03-22 10:10:16+01:00
Esemény típusa:
|
Esemény kezdete (UTC):
|
2023-03-22 09:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-22 09:50:00+00:00
|
|
Érintett létesítmény / egység:
|
Kieső kapacitás:
|
2023.03.22. 10:00 CET és 10:50 között XBID rendszerkarbantartás miatt a MAVIR interconnectorokon a kereskedés nem lesz lehetséges.
|
|
MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság
A0000123M.HU
|
|
|
Type of Event:
|
Event start (UTC):
|
2023-03-22 09:00:00+00:00
|
Event stop (UTC):
|
2023-03-22 09:50:00+00:00
|
|
Affected Asset or Unit:
|
Unavailable Capacity:
|
Please be informed that a maintenance on XBID is planned from 22.03.2023 10:00 CET until 22.03.2023 10:50 CET. During this time, XBID and all its services will not be available.
|
|
2023-03-22 04:33:34+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-22 02:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-22 12:00:00+00:00
|
|
Érintett létesítmény / egység:
Kelenföldi Erőmű GT
|
Kieső kapacitás:
177.8 MW
|
Gázturbina üzemzavar
|
|
Budapesti Erőmű Zrt
A00153463.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-22 02:00:00+00:00
|
Event stop (UTC):
|
2023-03-22 12:00:00+00:00
|
|
Affected Asset or Unit:
Kelenföld Power Plant Gasturbine
|
Unavailable Capacity:
177.8 MW
|
Gas turbine malfunction
|
|
2023-03-21 07:07:19+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-20 15:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-22 23:00:00+00:00
|
|
Érintett létesítmény / egység:
V. blokk
|
Kieső kapacitás:
34 MW
|
Intervallum záró időpont változik. Esemény vége időpont változik.
|
|
MVM Mátra Energia Zártkörűen Működő Részvénytársaság
A0000091L.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-20 15:00:00+00:00
|
Event stop (UTC):
|
2023-03-22 23:00:00+00:00
|
|
Affected Asset or Unit:
Unit V
|
Unavailable Capacity:
34 MW
|
Interval closing date change. Event stop change.
|
|
2023-03-20 22:16:37+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-20 15:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-21 23:00:00+00:00
|
|
Érintett létesítmény / egység:
V. blokk
|
Kieső kapacitás:
34 MW
|
|
|
MVM Mátra Energia Zártkörűen Működő Részvénytársaság
A0000091L.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-20 15:00:00+00:00
|
Event stop (UTC):
|
2023-03-21 23:00:00+00:00
|
|
Affected Asset or Unit:
Unit V
|
Unavailable Capacity:
34 MW
|
|
|
2023-03-20 10:26:51+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-20 15:00:00+00:00
|
Esemény vége (UTC):
|
2023-03-20 23:00:00+00:00
|
|
Érintett létesítmény / egység:
V. blokk
|
Kieső kapacitás:
34 MW
|
|
|
MVM Mátra Energia Zártkörűen Működő Részvénytársaság
A0000091L.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-20 15:00:00+00:00
|
Event stop (UTC):
|
2023-03-20 23:00:00+00:00
|
|
Affected Asset or Unit:
Unit V
|
Unavailable Capacity:
34 MW
|
|
|
2023-03-20 10:10:52+01:00
Esemény típusa:
|
Esemény kezdete (UTC):
|
2023-03-20 07:57:00+00:00
|
Esemény vége (UTC):
|
2023-03-20 09:13:00+00:00
|
|
Érintett létesítmény / egység:
|
Kieső kapacitás:
|
Technikai probléma miatt az XBID allokáció szünetelt a MAVIR (HU) – ELES (SI) metszéken.
|
|
MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság
A0000123M.HU
|
|
|
Type of Event:
|
Event start (UTC):
|
2023-03-20 07:57:00+00:00
|
Event stop (UTC):
|
2023-03-20 09:13:00+00:00
|
|
Affected Asset or Unit:
|
Unavailable Capacity:
|
Due to a technical issue the XBID allocation was on halt on the MAVIR (HU) – ELES (SI) interconnector.
|
|
2023-03-20 09:05:08+01:00
Esemény típusa:
|
Esemény kezdete (UTC):
|
2023-03-20 07:57:00+00:00
|
Esemény vége (UTC):
|
|
|
Érintett létesítmény / egység:
|
Kieső kapacitás:
|
Technikai probléma miatt az XBID allokáció szünetel a MAVIR (HU) – ELES (SI) metszéken.
|
|
MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság
A0000123M.HU
|
|
|
Type of Event:
|
Event start (UTC):
|
2023-03-20 07:57:00+00:00
|
Event stop (UTC):
|
|
|
Affected Asset or Unit:
|
Unavailable Capacity:
|
Due to a technical issue the XBID allocation is on halt on the MAVIR (HU) – ELES (SI) interconnector.
|
|
2023-03-18 11:38:53+01:00
Esemény típusa:
Termelés kiesése
|
Esemény kezdete (UTC):
|
2023-03-18 13:30:00+00:00
|
Esemény vége (UTC):
|
2023-03-18 15:00:00+00:00
|
|
Érintett létesítmény / egység:
IV. blokk
|
Kieső kapacitás:
114 MW
|
Kazánüzemi üzemzavar.
|
|
MVM Mátra Energia Zártkörűen Működő Részvénytársaság
A0000091L.HU
|
|
|
Type of Event:
Production unavailability
|
Event start (UTC):
|
2023-03-18 13:30:00+00:00
|
Event stop (UTC):
|
2023-03-18 15:00:00+00:00
|
|
Affected Asset or Unit:
Unit 4
|
Unavailable Capacity:
114 MW
|
Breakdown in boiler operation.
|
|
2023-03-17 15:25:41+01:00
Esemény típusa:
|
Esemény kezdete (UTC):
|
2023-03-17 13:49:00+00:00
|
Esemény vége (UTC):
|
2023-03-17 14:21:00+00:00
|
|
Érintett létesítmény / egység:
|
Kieső kapacitás:
|
Technikai probléma miatt az XBID allokáció szünetelt a MAVIR (HU) – ELES (SI) metszéken.
|
|
MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság
A0000123M.HU
|
|
|
Type of Event:
|
Event start (UTC):
|
2023-03-17 13:49:00+00:00
|
Event stop (UTC):
|
2023-03-17 14:21:00+00:00
|
|
Affected Asset or Unit:
|
Unavailable Capacity:
|
Due to a technical issue the XBID allocation was on halt on the MAVIR (HU) – ELES (SI) interconnector.
|
|
2023-03-17 15:23:13+01:00
Esemény típusa:
|
Esemény kezdete (UTC):
|
2023-03-17 13:49:00+00:00
|
Esemény vége (UTC):
|
|
|
Érintett létesítmény / egység:
|
Kieső kapacitás:
|
Technikai probléma miatt az XBID allokáció szünetelt a MAVIR (HU) – ELES (SI) metszéken.
|
|
MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító Zártkörűen Működő Részvénytársaság
A0000123M.HU
|
|
|
Type of Event:
|
Event start (UTC):
|
2023-03-17 13:49:00+00:00
|
Event stop (UTC):
|
|
|
Affected Asset or Unit:
|
Unavailable Capacity:
|
Due to a technical issue the XBID allocation was on halt on the MAVIR (HU) – ELES (SI) interconnector.
|
|